Email

sales@pushpaksteel.in

FINNED TUBES

FINNED TUBES
FINNED TUBES

FINNED TUBES Specification

  • Application
  • Construction
  • Material
  • Mild Steel
  • Section Shape
  • Round
  • Alloy or Not
  • Is Alloy
  • Size
  • 2 inch-3 inch
 

FINNED TUBES Trade Information

  • Minimum Order Quantity
  • 1000 Kilograms
  • Supply Ability
  • 1000000 Kilograms Per Month
  • Delivery Time
  • 2 Week
 

About FINNED TUBES

FINNED TUBES
Tell us about your requirement
product

Price:

Quantity
Select Unit

  • 50
  • 100
  • 200
  • 250
  • 500
  • 1000+
Additional detail
Mobile number

Email

More Products in ERW / SEAMLESS BOILER TUBES (IBR /NON IBR) Category

Economizer Super Heater Tubes and Coils

Economizer Super Heater Tubes and Coils

Price 185 INR / Kilograms

Minimum Order Quantity : 1000 Kilograms

Alloy or Not : Is Alloy

Material : Steel

Standard : Other

Length : 3,6,12 Meter (m)

Boiler Bank Tubes

Boiler Bank Tubes

Price 85 INR / Kilograms

Minimum Order Quantity : 1000 Kilograms

Alloy or Not : Is Alloy

Material : Mild Steel

Standard : ASTM

Length : 312 Meter (m)

ERW BOILER TUBES BS 3059 PART I & II, (IBR / NON IBR)

ERW BOILER TUBES BS 3059 PART I & II, (IBR / NON IBR)

Price 110 INR / Kilograms

Minimum Order Quantity : 1000 Kilograms

Alloy or Not : Is Alloy

Material : Steel

CARBON STEEL CDS P/E STRAIGHT TUBES, BS-3059 PART 1 & 2 CFS 320

CARBON STEEL CDS P/E STRAIGHT TUBES, BS-3059 PART 1 & 2 CFS 320

Price 2500 INR / Kilograms

Minimum Order Quantity : 1000 Kilograms



Back to top