Email

sales@pushpaksteel.in

CS/AS/SS HEAT EXCHANGER ERW/SEAMLESS TUBES

Product Image (03)

CARBON STEEL SEAMLESS HEAT EXCHANGER TUBES, ASTM A192 / ASME SA192

Price: 110 INR/Kilograms
  • Alloy or Not:Is Alloy
  • Material:Steel
  • Section Shape:Round
  • Size:10 to 101 MM OD .
  • Standard:ASTM
  • Surface Treatment:Painted
  • Delivery Time:2 Week
  • Supply Ability:1000000 Per Month
Product Image (01)

CARBON STEEL SEAMLESS HEAT EXCHANGER TUBES, SA 334 GR. 1,3,6,7,8 & 9

Price: 115 INR/Kilograms
  • Alloy or Not:Is Alloy
  • Application:Construction
  • Material:Steel
  • Section Shape:Round
  • Standard:ASTM
  • Surface Finish:Manual Polish
  • Surface Treatment:Galvanized
  • Delivery Time:2 Week
  • Supply Ability:1000000 Per Month
Product Image (01)

CDS SEAMLESS TUBES

Price: 95 INR/Kilograms
  • Alloy or Not:Is Alloy
  • Application:Construction
  • Material:Steel
  • Section Shape:Round
  • Standard:ASTM
  • Surface Finish:Manual Polish
  • Surface Treatment:Galvanized
  • Delivery Time:2 Week
  • Supply Ability:1000000 Per Month
Product Image (02)

EN 10305 1 Part I Seamless cold drawn precision tubes E215 E235 E255 E355

Price: 135 INR/Kilograms
  • Alloy or Not:Is Alloy
  • Application:Construction
  • Material:Steel
  • Product Type:Precision Steel Tubes
  • Section Shape:Round
  • Standard:ASTM
  • Surface Finish:Other,
  • Surface Treatment:Galvanized
  • Delivery Time:2 Week
  • Supply Ability:1000000 Per Month
Product Image (02)

Heat Exchanger Tubes CS-SS- Duplex-Titanium

Price: 150 INR/Kilograms
  • Alloy or Not:Is Alloy
  • Application:Construction
  • Length:6-12 Meter (m)
  • Material:Stainless Steel
  • Section Shape:Round
  • Size:10.0 To 101.6
  • Surface Finish:, Other
  • Surface Treatment:Painted
  • Delivery Time:2 Week
  • Supply Ability:1000000 Per Month
Product Image (03)

CARBON STEEL SEAMLESS HEAT EXCHANGER TUBES, ASTM A179 / ASME SA179

Price: 150 INR/Kilograms
  • Alloy or Not:Is Alloy
  • Application:Construction
  • Material:Other
  • Size:O.D.: 19.05 to 38.1mm
  • Standard:ASTM
  • Surface Treatment:Galvanized
  • Delivery Time:2 Week
  • Supply Ability:1000000 Per Month
X


Back to top